Sound System Crew

The Sound System Crew will take approximately 5 minutes to set-up and pack-up the Speaker Trailer (dropped off by the Tow Bar Crew) at the right location on the field.

The Crew simply have to ensure that the Generator has enough Petrol from the Jerry Can in the back of the Trailer and that the generator is turned on (like a Lawn mower) by ensuring it is:

  • Switched On;
  • Primed;
  • Set to Cold start (choke);
  • Pull the Start Cord; and
  • Once up and running set to Warm start.
Quick start guide for the Generator